The floor by the tank is getting refinished. It's almost done. Getting hinges for the doors, they should go on this week. The "backgrounds" are getting pond armor, then they can be siliconed in place.
Have the light, fx6 filter, hydro sponge 5 running to get seeded, heaters, lids, gravel, electrical outlets, bar sink installed. Several large pieces of holey rock and wood "cooking" in other tanks. Have about 12 fish ready to put in.
Getting excited. If I don't have to work, I'll hit the auction.
